Skip to content

Donau Malz Bamberger Mälzerei GmbH & Co. KG, Germany

Modernisation of towermalting plant

The exi­sting con­trol system for the tower mal­ting plant nee­ded to be moder­ni­zed. To this end, the exi­sting con­trol cabi­nets were equip­ped with the latest con­trol tech­no­lo­gy, the net­work infras­truc­tu­re was set up, and the Auto­ma­ti­onX aX5 pro­cess con­trol system was instal­led. The pro­ces­ses from soa­king to clea­ring the kilns were visua­li­zed, auto­ma­ted, and opti­mi­zed in the aX5. Fur­ther­mo­re, the dri­ve tech­no­lo­gy of the exi­sting units was brought up to date and also was inte­gra­ted into the Pro­fiNet net­work. Thanks to the increa­sed level of auto­ma­ti­on, the plant is also pre­pared for future digi­tizati­on measures.

Client

Donau Malz Bam­ber­ger Mäl­ze­rei GmbH & Co. KG

Plant type

Mal­ting plant

Project execution

2023 to 2024

Project scope

  • 2000 data points
  • Con­ver­si­on of 6 switch cabinets
  • 1 Ope­ra­ting station
  • 1 Ful­ly equip­ped Ser­ver station

Our services

  • Con­cept design and consulting
  • Stock-taking on site
  • Elec­tri­cal engineering
  • Crea­ti­on of func­tion­al design specification
  • Pro­gramming of software
  • Pro­ject engi­nee­ring of visua­li­sa­ti­on system
  • Switch­gear construction
  • On-site con­ver­si­ons
  • Signal test and start-up
  • Ope­ra­tor training

Technology applied

  • Auto­ma­ti­onX aX5
  • PROFINET
  • EPlan P8

Contact

Marc Die­sing Seni­or Pro­cess Auto­ma­ti­on Con­sul­tant, Schmid Auto­ma­ti­on GmbH

Back To Top