skip to Main Content

Getreide Züri Nord AG, Niederhasli, Switzerland

Updating of Intake 1

The plant con­sists of two sec­tions, Inta­ke 1 and the Mill. The Mill still uses the silo bins for sto­rage. Inta­ke 1 dates back to the seven­ties and was ope­ra­ted through a mimic dia­gram befo­re the con­ver­si­on. The Mill was alre­a­dy equip­ped with a pro­cess con­trol system dating back to the nine­ties. We updated the com­ple­te con­trol system. All the switch­gear of Inta­ke 1 was repla­ced, and the con­trol cabi­nets of the Mill were equip­ped with new I/O systems. In addi­ti­on, an enti­re­ly new pro­cess con­trol system cove­ring both plant sec­tions was imple­men­ted and put into service.

Client

Getrei­de Züri Nord AG, Nie­der­has­li, Switzerland

Plant type

Bulk sto­rage silo

Project execution

2018 to 2019

Project scope

  • 1300 data points
  • Ser­ver cabinet
  • 4 MCCs, total 7 panels
  • Con­ver­si­on of 4 con­trol cabinets

Our services

  • Con­cept design and consulting
  • Stock-taking on site
  • Crea­ti­on of flow chart
  • Crea­ti­on of equip­ment list
  • Elec­tri­cal engineering
  • Crea­ti­on of soft­ware per­for­mance description
  • Pro­gramming of software
  • Pro­ject engi­nee­ring of visua­li­sa­ti­on system
  • Inter­face with weig­hing scale
  • Instal­la­ti­on plan­ning and invi­ta­ti­ons to tender
  • Switch­gear and con­trol system
  • On-site con­ver­si­ons
  • Signal test and start-up
  • Ope­ra­tor training

Technology applied

  • auto­ma­ti­onX
  • PROFINET
  • EPlan P8

Contact

Mar­cel Fust, Seni­or Pro­cess Auto­ma­ti­on Con­sul­tant, Schmid Auto­ma­ti­on AG

Back To Top