Kornmühle Sachseln AG, Sachseln, Switzerland
The new Kornmühle Sachseln AG building is a grain processing facility designed for efficiency, transparency, and future viability. The mill…
The new Kornmühle Sachseln AG building is a grain processing facility designed for efficiency, transparency, and future viability. The mill…
The existing control system for the brewhouse and malting plant needed to be modernised and consolidated. To this end, the…
The manual germ air control system was replaced by a fully automatic control system. In the five existing germ lines,…
The challenge The Güntensperger cheese dairy in Toggenburg stands for the highest art of cheese making, rooted in tradition and…
In 2011, an existing process control system (PCS) was installed, which has now been replaced by a modern system. As…
As part of the modernization project, the relay control system of the silo plant from 1969, 1974 and 1980 was…
As part of the modernization project, the control system of the silo system from 1971 was replaced with a new,…
Up to now, good quantities and error patterns with downtimes of the 50 packaging and filling lines at the seven…
The University of Applied Sciences of Zurich (ZHAW) is constructing a new building for the Institute for Food and Beverage…
The new plant consists of a grist mill with silo and big-bag storage. A fully automated 60hl brewhouse with four…
For complete and up-to-date documentation according to ISO9001, all electrical diagrams were newly created in digital form. The new form…
The germination plant to be modernised at the Kreimbach factory comprises two Lausmann germination lines, each with a capacity of…