Bamberger Mälzerei, Mülheim a.d. Ruhr, Germany
The control system for the five germination boxes was replaced by the modern control and process control system from AutomationX…
The control system for the five germination boxes was replaced by the modern control and process control system from AutomationX…
The existing control system for the tower malting plant needed to be modernized. To this end, the existing control cabinets…
As part of the modernization process, the control system for the drying plant in Säriswil was completely overhauled. The outdated…
The manual germ air control system was replaced by a fully automatic control system. In the five existing germ lines,…
In 2011, an existing process control system (PCS) was installed, which has now been replaced by a modern system. As…
As part of the modernization project, the relay control system of the silo plant from 1969, 1974 and 1980 was…
As part of the modernization project, the control system of the silo system from 1971 was replaced with a new,…
For complete and up-to-date documentation according to ISO9001, all electrical diagrams were newly created in digital form. The new form…
The germination plant to be modernised at the Kreimbach factory comprises two Lausmann germination lines, each with a capacity of…
The existing control system and mechanics from 1970 was converted during running operation. For such a refurbishment operation at the…
The customer's requirement was to bring together all silo control, malting and laboratory data on a uniform platform. It should…
The control system for three new 180to germination boxes and two new 180to kilns were delivered. Each unit is controlled…