Kornmühle Sachseln AG, Sachseln, Switzerland
The new Kornmühle Sachseln AG building is a grain processing facility designed for efficiency, transparency, and future viability. The mill…
The new Kornmühle Sachseln AG building is a grain processing facility designed for efficiency, transparency, and future viability. The mill…
The existing control system for the brewhouse and malting plant needed to be modernised and consolidated. To this end, the…
The challenge The Güntensperger cheese dairy in Toggenburg stands for the highest art of cheese making, rooted in tradition and…
In 2011, an existing process control system (PCS) was installed, which has now been replaced by a modern system. As…
As part of the modernization project, the relay control system of the silo plant from 1969, 1974 and 1980 was…
As part of the modernization project, the control system of the silo system from 1971 was replaced with a new,…
Up to now, good quantities and error patterns with downtimes of the 50 packaging and filling lines at the seven…
The University of Applied Sciences of Zurich (ZHAW) is constructing a new building for the Institute for Food and Beverage…
The new plant consists of a grist mill with silo and big-bag storage. A fully automated 60hl brewhouse with four…
The germination plant to be modernised at the Kreimbach factory comprises two Lausmann germination lines, each with a capacity of…
The existing control system and mechanics from 1970 was converted during running operation. For such a refurbishment operation at the…
The customer's requirement was to bring together all silo control, malting and laboratory data on a uniform platform. It should…