skip to Main Content

Abwasserverband Altenrhein, Switzerland

Updating of outstations

The sewers and com­bi­ned waste water sewers fee­ding the sewa­ge tre­at­ment plant have a length of 334 kilo­me­t­res. This net­work inclu­des out­sta­ti­ons such as 88 waste water pum­ping sta­ti­ons, 22 rain­wa­ter basins, 26 storm­wa­ter over­flows, 8 mea­su­re­ment points, 12 cul­verts, 2 stack­ing systems, 2 gal­lery weirs and 1 drop shaft.The con­trol system update in the out­sta­ti­ons inclu­ded elec­tri­cal engi­nee­ring, the new con­trol panels with new con­trol systems, the new soft­ware and the cen­tra­li­sed inter­lin­king of all sta­ti­ons in the cen­tral system in Altenrhein.

Client

Abwas­ser­ver­band Alten­rhein, Switz­er­land

Plant type

Sewa­ge tre­at­ment plant

Project execution

2016 to 2022

Project scope

  • 4’000 data points
  • 10 MCCs / low-vol­ta­ge main dis­tri­bu­ti­on system, approx. 20 panels
  • 100 local cabi­nets, out­sta­ti­on cabins

Our services

  • Elec­tri­cal engineering
  • Con­trol cabi­net layout
  • Pro­gramming of software
  • Pro­ject engi­nee­ring of visua­li­sa­ti­on system
  • Signal test and start-up
  • Ope­ra­tor training

Technology applied

  • auto­ma­ti­onX
  • EPlan P8

Contact

Chri­sti­an Vetsch, Head of Depart­ment Soft­ware Engi­nee­ring, Schmid Auto­ma­ti­on AG

Back To Top