Abwasserverband Altenrhein, Switzerland
Updating of outstations
The sewers and combined waste water sewers feeding the sewage treatment plant have a length of 334 kilometres. This network includes outstations such as 88 waste water pumping stations, 22 rainwater basins, 26 stormwater overflows, 8 measurement points, 12 culverts, 2 stacking systems, 2 gallery weirs and 1 drop shaft.The control system update in the outstations included electrical engineering, the new control panels with new control systems, the new software and the centralised interlinking of all stations in the central system in Altenrhein.
Client
Abwasserverband Altenrhein, Switzerland
Plant type
Sewage treatment plant
Project execution
2016 to 2022
Project scope
- 4’000 data points
- 10 MCCs / low-voltage main distribution system, approx. 20 panels
- 100 local cabinets, outstation cabins
Our services
- Electrical engineering
- Control cabinet layout
- Programming of software
- Project engineering of visualisation system
- Signal test and start-up
- Operator training
Technology applied
- automationX
- EPlan P8
Contact
Christian Vetsch, Head of Department Software Engineering, Schmid Automation AG